Multilevel charging distribution at the Mobility location at Bern SBB station

At the Mobility site at Bern SBB station, 29 Etrel charging stations were installed, which are intelligently controlled by our CLEMAP Load Management System. This efficiently distributes the available grid power of 100 kW to all stations, preventing overloads and ensuring reliable charging of electric vehicles.

Downloads